Installation & After Sales Support
 

We are committed to provide full customer satisfaction to customers. We made quality product and to keep our customers hassle free and satisfied weprovide installation and maintenance services to our customers as per their requirement. Our After Sales Support Team is always ready to assist you for any information or help you may need.

Energy Audit
 
An energy audit identifies where energy is being consumed and assesses energy saving opportunities so you get to save money where it counts the most.
We provide the energy audit services as a preliminary activity towards instituting energy efficiency programs in an establishment. It consists of activities that seek to identify conservation opportunities preliminary to the development of an energy savings program.
Content of an audit:
As an energy auditor we seek to document things that are sometimes ignored in the plant, such as the energy being used on site per year, which processes use the energy, and the opportunities for savings. In so doing, it assesses the effectiveness of management structure for controlling energy use and implementing changes. The energy audit action plan lists the steps and sets the preliminary budget for the energy management program.
Energy use analysis:
 
Identifying where energy is used is useful because it identifies which areas the audit should focus on and raises awareness of energy use and cost. The results of the analysis can be used in the review of management structures and procedures for controlling energy use.
Analysis of energy use can be done by installing submeters in different plant locations to pinpoint actual energy usage per area. This is a good source data for allocating energy use. The plant manager can also list all equipment used and the corresponding operating hours. With this information, he can create spreadsheet information and generate charts useful for analysis.
 

Important Points to Consider When Collecting Site Load Data

a.
Operating hours - This can be gathered from plant personnel. It is important to ensure the accuracy of this data because much of the potential for energy savings lies on correct estimation of the equipment’s operating hours.
b. Duty cycle - Machines such as large electric motors have varying loads and hence, different power requirements.
c. Actual power consumed - For electric power users, this is based on either 3-phase current/voltage readings or power analyzer measurements (e.g., direct kW which incorporates power factor)
Energy projectsidentificaton
 
Opportunities for energy savings can range from the simplest, such as lighting retrofits, to the most complex such as the installation of a cogeneration plant. The important thing to remember is to focus on major energy users and areas.
Cost benefit analysis
 
The identified energy conservation opportunities should be analyzed in terms of the costs of implementing the project versus the benefits that can be gained. If you want to, say, install a heat plate exchanger to recover waste heat, you need to calculate the total cost of installation and compare that with the savings you will derive from recovering waste heat. It makes sense to go on with the project if there is a net positive benefit from the project.
Action plan to set implementation priority
  After passing the cost benefit test, an action plan should be developed to ensure that the opportunities identified are implemented. The action plan should include all the major steps for implementing the opportunity as well as the people responsible. Furthermore, there should be a plan for monitoring the results.